Day 3: Floor Joists and Subfloor


Today the focus was on wrapping up the floor joists and starting the installation of the plywood subfloor. As you can see in the last picture below, the floor is not sloping anymore and is now level. The builder also added more joists to help strengthen the floor. Tomorrow the plan is to finish the plywood subfloor (including the area in front of the washer/dryer, which was saved for last so there was a platform to stand on).